Advanced Technology Facilities
Engineering solutions, equipment sales, and facility services for the semiconductor and cleanroom industry — built on 20+ years of industry expertise.
Company Introduction
SemiCo was founded by teams of engineers with more than 20 years' experience in the semiconductor industry.
The company focuses on providing customers with high-value oriented services and value-added purchases for Advanced Technology Facilities.
Together with global talents, SemiCo ensures successful delivery of projects — meeting Time, Cost, Quality, and Safety objectives.
Our Mission
Our mission is to deliver solutions with unmatched speed and efficiency, reducing lead times to empower our customers with faster results.
What We Do
End-to-end solutions for semiconductor facilities — from design to ongoing maintenance.
Design and build control systems, hook-up services, and utility connections for semiconductor tools, ensuring cleanroom compliance.
Sourcing, trading, and research support for semiconductor equipment. Access to global procurement networks.
International sourcing of components and equipment — leveraging a global talent network for reliable supply chains.
End-to-end project management meeting Time, Cost, Quality, and Safety objectives for advanced technology facilities.
Ongoing facility operations, monitoring, preventive maintenance, and continuous improvement for cleanroom environments.
Maintenance and servicing for fire suppression systems — handled by personnel with 30+ years of industry experience.
Equipment Solutions
Specialized equipment for wafer fabrication, chemical processing, and advanced panel manufacturing.
Critical for wafer cleaning and chemical processing — designed for RCA cleans, HF dips, and IPA drying with full safety compliance.
Precision dosing of acids and solvents — fluoropolymer construction ensures compatibility with HF, HCl, and IPA.
Single or dual chamber configurations. Capable of cleaning 2–12 inch silicon wafers with high throughput.
Large-format panel processing — optimized for flat panel display substrates and advanced packaging applications.
Front Opening Unified Pod cleaning systems for 510×515 panel processes — maintaining contamination-free environments.
Specialized for silicon carbide wafer fabrication — handling high-temperature, high-hardness materials with advanced etching and polishing systems.
True 6 Degrees of Freedom (6-DOF) active vibration control with AI integration. Active gain starting from 0.5 Hz with adaptive variable damping (patent pending).
Safety Systems
SemiCo's fire protection division is handled by trained personnel with more than 30 years of experience in the industry, having managed multiple projects across Singapore.
SYSTEMS COVERED
Installation, commissioning, and ongoing maintenance by certified professionals.
Annual inspection and testing to Singapore regulatory standards.
Emergency response support and rapid incident management.
30+ years combined team experience · Multiple Singapore project references
Construction Services
A structured six-phase approach ensuring ISO-compliant cleanroom delivery on time and within budget.
Define scope, ISO class level, facility space, and compliance standards.
Architectural layout, HVAC, filtration, utility integration, and safety planning.
Build cleanroom structure, install HVAC, DIW/PCW pipelines, and waste treatment.
Deliver, install, and connect semiconductor tools; validate performance.
ISO certification, airflow, particle count, and environmental stability testing.
Ongoing monitoring, preventive maintenance, and continuous improvement.
Organisation
Structured for delivery excellence across all project phases.
Track Record
Completed and ongoing fire protection installations across Singapore's leading semiconductor and pharmaceutical facilities.
| Year / Duration | Main Contractor | Project Title |
|---|---|---|
| 2026 (Ongoing) | Taser Power Pte Ltd | Taser Power Plant — Installation of Sprinkler System |
| 2026 · 1 month | TLG | Micron — Installation of CO₂ System |
| 2025 · 6 months | Picotech | A*Star Fusionopolis — Installation of Fire Sprinkler and CO₂ System |
| 2025 · 6 months | SMM | Paris Ris Camp — Installation of Fire Alarm System |
| 2024 · 4 months | Exyte Singapore | Novartis Early Package 6BR — Diversion of Fire Main Ring System |
| 2023 · 10 months | Exyte Singapore | Biontech Project Lion — Installation of Fire Sprinkler, Fire Hose Reel and Novec System |
| 2023 · 3 months | Exyte Singapore | Novartis Project WFI — Diversion of Fire Main Ring System and Installation of Fire Sprinkler System |
| 2022 · 12 months | Exyte Singapore | Global Foundries FAB7H — Project Management for F26A Fire Protection System |
| 2021 · 12 months | Exyte Singapore | Siltronic Project CZ Expansion SIN — Installation of Fire Sprinkler, Fire Hose Reel, Dry Riser, FM200, Pre-Action and Water Flooding System |
| 2020 · 16 months | Sato Kogyo | SSMC Expansion — Installation of Fire Alarm, VESDA and Smoke Control System |
Get In Touch
Address
9012 Tampines Street 93, #04-211
Singapore 528845
Telephone
+65 8198 8828
Soonkt@Semico-sg.com
UEN
202617968W